fbpx

23.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, the walls are being laid with ceramic block. In Block B – installation of vertical structure formwork. In Block C – reinforcement of the foundation slab. Drainage excavation works continue on the territory.