02.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A - the walls are being laid with ceramic block on the 2nd floor. Block B - installation of column formwork and floor slab is in progress.
02.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A - the walls are being laid with ceramic block on the 2nd floor. Block B - installation of column formwork and floor slab is in progress.