fbpx

08.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In block A on the 2nd floor the walls are being laid with ceramic block. In block B the floor slab formwork is being assembled. Reinforcement of vertical structures is being carried out in Block C.