19.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, ceramic block masonry is being laid on the second and third floors. Concreting of vertical structures took place in Block B. Fireplaces are being installed in block E.
19.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, ceramic block masonry is being laid on the second and third floors. Concreting of vertical structures took place in Block B. Fireplaces are being installed in block E.