24.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, ceramic block masonry is being laid on the second and third floors. Fireplaces are being installed in block E. In Block B, the formwork of vertical structures is being assembled.

Natalya
Sales manager
Customer Service Department Venyoo