fbpx

01.07.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — On the 2nd and 3rd floor of Block A, the walls are being laid with ceramic block. In blocks B and C, the installation of formwork for vertical structures is in progress. Fireplaces are being installed in block E.