fbpx

16.07.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Installation of internal engineering networks and installation of profiles for installation of GKL partitions on the 3rd construction (2 hotel) floor are in progress. Acceptance for the foundation of the freight and passenger elevator is in progress.