16.07.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A: works on ceramic block walls on the 3rd floor are in progress. Block B: works on installation of the floor slab formwork and drainage system are in progress. Block C: works on reinforcement of the floor slab are in progress. Block E: work is underway to install ceramic block walls and staircase formwork.