fbpx

21.07.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Loading of ceramic block on the floors is in progress. On the 1st construction (Ground Floor) floor the walls are being laid with ceramic block. On the 7th construction floor (6th hotel) profiles for GKL partitions are being installed.