fbpx

27.07.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Balcony framing continues on the floors. Wall masonry with ceramic block is going on the 1st construction (Ground Floor) floor. Mocap installation works are underway on the 13th (12th) floor.