05.08.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 1st construction (Ground Floor) floor the ceramic block walls continue to be laid. Mockup, balcony framing, dusting of ceilings in common areas, technological holes in floor slabs. Aqua+ excavation works are underway.