19.08.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — The facility continues to pour concrete sides (framing) of balconies and their waterproofing, installation of gypsum cardboard framework of internal partitions, installation of construction garbage chute, drilling of technological holes in floor slabs, dusting of ceilings in common areas. On the 20th floor, ceramic block walls are being laid and holes on the staircase are being sealed.