fbpx

24.08.2024 — Elite Family Residence — Plasterboard ceilings and air conditioning routes are being installed. Preparation of wall leveling works is underway. Geodetic layout for the railing is being carried out. Marble window sills are installed. Technical rooms of the ground floor are being plastered. The system of automatic fire extinguishing control is being tested. Cement has been delivered to the site.