fbpx

29.08.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Ceramoblock walls continue to be laid in Block A, on the fourth and fifth floors. Ceramoblock walls are being laid in Block B (on the second floor) and reinforcement of the floor slab is underway.