Get a Consultation

← All news

30.08.2024 — Wyndham Grand Residences Batumi Gonio.

30.08.2024 — Wyndham Grand Residences Batumi Gonio.

30.08.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block B - ceramic block laying (second floor), laying of fireplaces and parapet, cleaning and arrangement of ceramic block (third floor), installation of stairs. In block C - installation of the floor slab formwork. And in block E - installation of monolithic boards for stained glass windows.