08.09.2024 — Elite Family Residence — Preparation of the lift shaft, installation of metal railings and digging of a trench for the external sewerage system are in progress. The walls are being finished in the mockup.
08.09.2024 — Elite Family Residence — Preparation of the lift shaft, installation of metal railings and digging of a trench for the external sewerage system are in progress. The walls are being finished in the mockup.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st