Wyndham Grand Batumi Gonio. Aqua — On the 2nd floor: - Installation of GKL partitions On the 3rd floor: - Installation of plumbing in mockup On the 13th floor: - Colouring of balconies in mockup On the floors works are performed: - Installation of formwork and framing of reinforced concrete sides of balconies - Installation of decorative boxes on balconies - Installation of stained glass - Dusting of ceilings - Installation of entrance group - Anticorrosive works (metal painting) - Diamond drilling of engineering holes - Arrangement of lift shaft coverings (preparation for installation of lift equipment). On the territory there are geodesic works, glass units are lifted to the floors.