Wyndham Grand Batumi Gonio. Aqua — 1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel. 2. Installation of stained-glass windows Arrangement of borders for stained-glass windows and installation of stained-glass windows. Provides light permeability and improves heat and sound insulation of hotel rooms. 3. Arrangement of mocap, 12th floor Allows to visualize and check the design and materials of the hotel room. Floor screed work in the bathroom. 4. Arrangement of storm water drainage risers, 10-20 floors 5. Facade works, 7th, 6th, 9th floors Facade works on balconies. 6. Installation of decorative boxes, 15-17 floors. Also works on installation of plasterboard frame of internal partitions continue.