Elite Family Residence

1. Finishing work.
— Installation of moldings.
— Laying porcelain tiles.
— Painting work, 5th floor.
— Facing travertine on balconies.

2. Facade works.

3. Arrangement of the railing of the central facade.
Painting of balusters.

4. electrical installation works.

5. Installation of interior doors.