Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Installation of plumbing, 14–15 floor.
— Installation of electrics,
2. Installation of
On 9–17 floors.
3. Installation of gypsum plasterboard frame, 15–17 floors.
Arrangement of partitions.
4. Ceiling installation on balconies.
On 12–13 floors.
5. Arrangement of elevator shafts.
Installation of lighting.
6. Infrastructure building.
The works were not carried out due to weather conditions.