Wyndham Grand Batumi Gonio. Riviera.

1. Block A, B, C, E. Facade works.
Plastering of the facade.

2. Block E. Waterproofing works.
Preparation of rear patios of townhouses for waterproofing works.

3. Infrastructure building.
Flashing of storm drainage boxes.

4. Installation of storm drainage system.
Fabrication of storm drainage boxes.