Wyndham Grand Batumi Gonio. Riviera.
1. Block B, C. Facade works.
Plastering of the facade.
2. Block A. Facade works.
Priming of facade.
3. Block B, C. Installation of
Glass installation.
4. Infrastructure building. Installation of storm water drainage system.
Closing of storm sewer ducts.