Wyndham Grand Batumi Gonio. Riviera.
1. Block A. Installation of engineering systems.
Installation of
2. Block A. Plasterboard framing.
3. Block A. Plastering works.
Plastering of columns in the basement.
4. Block E. Waterproofing works.
Waterproofing in rear yards of townhouses.
5. Arrangement of storm water drainage.
Fabrication of storm water drainage boxes.