Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Installation of engineering systems.
— Installation of air-conditioning system, drainage.
— Electrical installation works.

2. Block A. Plastering works.
Plastering of columns in the basement.

3. Block B. Installation of engineering systems.
Hot and cold water supply.

4. Arrangement of storm water drainage.
Fabrication of storm water drainage boxes.

5. Facade works.
Facade insulation.