Wyndham Grand Batumi Gonio. Aqua

1. Installation of elevator shafts.
— Installation of elevator equipment, installation of doors.
— Painting in elevator shafts.

2. finishing works, 20th floor.
Laying tiles on the balconies.

3. Plastering works, 18th floor.
Decorative plastering.

4. Plasterboard frame installation works.
Arrangement of the framework on the balconies.
5. Infrastructure building.
Reinforcement of floor slab 2 floor.