Wyndham Grand Batumi Gonio. Aqua
1. Installation of elevator shafts.
— Installation of elevator equipment, installation of doors.
— Painting in elevator shafts.
2. finishing works, 20th floor.
Laying of tiles on balconies, curbs and baseboards.
3. Plastering works, 18th floor.
Decorative plastering.
4. Plasterboard frame installation works.
Arrangement of the framework on the balconies.
5. Works on waterproofing.
Works on the roof of the building.
6. Infrastructure building.
Reinforcement of the floor slab of the 2nd floor.