Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Installation of ventilation system.
— Electrical installation works.
— Plumbing works.
2. Installation of elevator shafts.
— Installation of elevator equipment, installation of doors.
— Painting in elevator shafts.
— Installation of lighting in elevator shafts.
3. plastering works.
Arrangement of decorative plaster.
4. Plasterboard frame installation works.
Arrangement of the ceiling frame on the balconies.
5. Infrastructure building.
Concreting of the floor slab of the 2nd floor.