Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
Cable laying, clip installation, vent valve installation, 7th floor.

2. Installation of elevator shafts.
— Installation of elevator equipment.
— Installation of lighting in elevator shafts.

3. Plastering work.
Installation of decorative plaster.

4. Installation of plasterboard frames.
Covering of ceiling frames on balconies.

5. Finishing work.
Laying tiles on balconies.