Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Plastering work.
Plastering columns in the basement.

2. Block A. Installation of chimneys.

3. Block E. Installation of engineering systems.
— Electrical installation work, marking, fastening clips, cable routing.
— Installation of a drainage system.

4. Infrastructure building.
Waterproofing work.