Wyndham Grand Batumi Gonio. Riviera.
1. Block A. Plastering work.
Plastering columns in the basement.
2. Block A. Chimney installation.
Sealing chimneys.
3. Block A. Facade work.
Plastering of facade ends.
4. Block E. Installation of engineering systems.
— Electrical installation work, marking, fastening clips, cable routing.
— Installation of drainage system.
5. Infrastructure building.
Waterproofing work.