Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Electrical installation work.
— Plumbing work.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. Plastering work.
Installation of decorative plaster on ceilings.

4. Installation of plasterboard frames.
Covering of ceiling frames on balconies.

5. Infrastructure building.
Formwork installation, reinforcement of vertical structures, 3rd floor.