Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work.

— Plumbing work.

— Installation of air conditioning system.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Installation of plasterboard frame.

Installation of frame for inter-unit partitions, covering of frame.

4. Finishing work, 19th floor.

Laying tiles on balconies.

5. Roof work.

Tying up posts.

6. Infrastructure building.

— Dismantling formwork for vertical structures, 6th floor.

— Laying ceramic blocks, 2nd floor.