Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Finishing works.
Laying porcelain stoneware on balconies.
2. Waterproofing works.
Installation of coating waterproofing on balconies.
3. Plastering work.
— Application of decorative plaster on balconies.
— Plastering of walls.
Block B
1. Plastering work.
Plastering of walls on the 3rd floor.
2. Installation of elevator shafts.
Laying of elevator portal blocks.
3. Installation of stained glass structures.
Installation of double-glazed windows in stained glass and installation of stained glass joints.
4. Installation of storm drainage.
Covering of storm drainage boxes on balconies with concrete panels.