05.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua The installation of formwork for the slab on the 14th construction (13th hotel) floor is in progress. The construction of ceramic block walls is going on the 2nd(1), 3rd (2) and 4th (3) floors.
05.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua The installation of formwork for the slab on the 14th construction (13th hotel) floor is in progress. The construction of ceramic block walls is going on the 2nd(1), 3rd (2) and 4th (3) floors.