08.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab of the 14th construction (13th hotel) floor is in progress. On 3(2) and 4(3) walls are being laid with ceramic block.
08.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab of the 14th construction (13th hotel) floor is in progress. On 3(2) and 4(3) walls are being laid with ceramic block.