14.09.2023 - Wyndham Grand Residences Batumi Gonio. Aqua - On the 14th construction floor (13th hotel floor) the installation of column formwork has started. Ceramic block walling continues on floors 3(2) and 4(3).
14.09.2023 - Wyndham Grand Residences Batumi Gonio. Aqua - On the 14th construction floor (13th hotel floor) the installation of column formwork has started. Ceramic block walling continues on floors 3(2) and 4(3).
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st