25.09.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Concreting of the floor slab has been carried out on the 15th construction (14 hotel) floor. Wall masonry with ceramic block continues on the 5th (4) floor.
25.09.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Concreting of the floor slab has been carried out on the 15th construction (14 hotel) floor. Wall masonry with ceramic block continues on the 5th (4) floor.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st