26.09.2023 — Elite Family Residence — Concreting of vertical structures took place on the 7th construction (6th residential) floor. Installation of the penthouse roof formwork has started. Block wall masonry is underway on the 2(1) floor.
26.09.2023 — Elite Family Residence — Concreting of vertical structures took place on the 7th construction (6th residential) floor. Installation of the penthouse roof formwork has started. Block wall masonry is underway on the 2(1) floor.