04.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 15th construction (14 hotel) floor, the column formwork is being dismantled. On the 5th (4) floor, the masonry of the walls with ceramic block continues.
04.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 15th construction (14 hotel) floor, the column formwork is being dismantled. On the 5th (4) floor, the masonry of the walls with ceramic block continues.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st