06.10.2023 — Elite Family Residence — Reinforcement of the floor slab above the 7th construction (6th residential) floor is completed. Laying of ceramic block walls on the 2nd (1st) floor is in progress.
06.10.2023 — Elite Family Residence — Reinforcement of the floor slab above the 7th construction (6th residential) floor is completed. Laying of ceramic block walls on the 2nd (1st) floor is in progress.