fbpx

24.10.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, the floor slab formwork is being installed and thermal insulation of the underground part of the foundation is underway. In Block E, reinforcement of the 3rd floor columns is in progress.