Get a Consultation

Wyndham Grand Batumi Gonio Events

  • News
  • Media publications
  • Articles

08.12.2023 — Elite Family Residence

Ceramic block wall masonry continues on the 5th construction (4 residential) and 6th (5) floors.

07.12.2023 — Elite Family Residence

Ceramic block walls are being laid on floors 5 (4) and 6 (5). Building materials are being loaded on the floors.

07.12.2023 — Wyndham Grand Residences Batumi Gonio.

Family Club — In Block A, the installation of formwork for the 3rd floor floor slab continues and backfilling of the excavation slots is in progress. Excavation…

07.12.2023 — Wyndham Grand Residences Batumi Gonio. Riviera

In Block A, work continues on the formwork for the floor slab on the 3rd floor. Installation of lighting on the floors has started. Excavation works are being…

07.12.2023 — Wyndham Grand Residences Batumi Gonio.

Aqua — After concreting the columns of the 19th construction (18th hotel) floor, the formwork is dismantled and reinforcement continues. On the 9th (8) and 11th…

06.12.2023 — Elite Family Residence

Ceramic block wall masonry continues on the 5th construction (4 residential) and 6th (5) floors.

Georgia's GDP Continues to Grow in 2023

In June 2023, Georgia's GDP increased by 7.7%. The average growth rate for the first half of 2023 was 7.6%, according to the Georgian National Statistical…

New Premium Hotel From Wyndham Hotels & Resorts Opens in Greece

The world’s largest hotel network, Wyndham Hotels & Resorts, has unveiled its first European property under one of its two premium brands, Registry Collection…