20.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A - wall masonry with ceramic block continues. Block B - installation of formwork of the 1st stage of vertical structures and reinforcement of the 2nd stage of the foundation slab continues. Block C - excavation works Also excavation works are underway at the site of the infrastructure building.