fbpx

20.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A – wall masonry with ceramic block continues. Block B – installation of formwork of the 1st stage of vertical structures and reinforcement of the 2nd stage of the foundation slab continues. Block C – excavation works Also excavation works are underway at the site of the infrastructure building.