Get a Consultation

← All news

21.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera

21.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera

21.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A - laying of walls with ceramic block. Block B - dismantling of the column formwork Infrastructure building - waterproofing of the underground part of the foundation and backfilling of the excavation slots.