fbpx

21.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A – laying of walls with ceramic block. Block B – dismantling of the column formwork Infrastructure building – waterproofing of the underground part of the foundation and backfilling of the excavation slots.