fbpx

24.07.2024 — Elite Family Residence — Installation of heating and cold/hot water supply systems, masonry of elevator portals with gas-silicate block, tank connections are in progress. Painting works are also underway in the mocap, construction of GKL frameworks at the storm drain frames and in the common areas