Get a Consultation

← All news

24.07.2024 — Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
24.07.2024 — Elite Family Residence

24.07.2024 — Elite Family Residence — Installation of heating and cold/hot water supply systems, masonry of elevator portals with gas-silicate block, tank connections are in progress. Painting works are also underway in the mocap, construction of GKL frameworks at the storm drain frames and in the common areas

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news