fbpx

30.07.2024 — Elite Family Residence — Installation of heating systems, cold/hot water supply, low-current fire extinguishing system and GKL frames in common areas is in progress. The masonry of elevator portals with gas-silicate block is in progress. Painting works are going on 2 construction (1 residential), 3 (2) floors and mocap. Screeding and installation of sockets is in progress.