Get a Consultation

← All news

30.07.2024 — Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
30.07.2024 — Elite Family Residence

30.07.2024 — Elite Family Residence — Installation of heating systems, cold/hot water supply, low-current fire extinguishing system and GKL frames in common areas is in progress. The masonry of elevator portals with gas-silicate block is in progress. Painting works are going on 2 construction (1 residential), 3 (2) floors and mocap. Screeding and installation of sockets is in progress.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news